Guides for artists ·

Writing a budget for a residency, commission or exhibition proposal

What to include in a project budget, how to price your own time, and when to add contingency.

A budget is a forecast of what the project will cost and where the money goes. Many residencies, commissions and grants ask for one because they need to judge whether your plan is realistic and whether the amount you request matches the scope of the work. A clear budget tells the panel you have thought the project through.

Start with what the call covers and what it does not

Read the brief to see what the organiser already provides: studio space, materials allowance, accommodation, travel, technical support, production costs, insurance. Then list what you will need to pay for yourself. If the call offers a fixed stipend or fee, check whether it is meant to cover your time only or also materials and other costs. If the total budget is open, you will propose both your fee and the project costs.

Some calls give a maximum figure. Others ask you to request what you need. If no limit is stated, look at past awards or comparable projects to judge what is reasonable.

Break costs into clear categories

A simple structure makes the budget easy to read and compare with other applications. Common categories include:

  • Artist fee or stipend for your time and labour.
  • Materials and equipment you will buy or hire to make the work.
  • Fabrication or specialist production if you are outsourcing parts of the making.
  • Travel (flights, train, local transport) and accommodation, if not provided.
  • Transport and shipping of work or materials.
  • Documentation (photography, videography, editing).
  • Insurance for the work in transit or on display.
  • Contingency (usually a percentage of the total).

If the project involves assistants, performers, or contributors, list their fees separately. If you are working with a collaborator, clarify how the fee is split.

Price your own time

Your artist fee is not a bonus; it is payment for your intellectual work, research, design, planning, communication and presence. Even if the project feels experimental or you are grateful for the opportunity, include a line for your own labour.

If the call names a fixed stipend, that is your fee. If you must propose one, consider how many weeks or months you will spend on the project, including preparation, the residency or production period, and follow-up. Think about what you need to live and work during that time, and what you have been paid for comparable projects before.

Different sectors and countries have different norms. Some public commissions expect you to use a day rate or hourly rate; others work from a percentage of the total budget. If you are unsure, look at what artist unions or guilds in the region recommend, or ask peers who have done similar work.

If you are proposing a large total budget and your fee seems too high to the funder, they will negotiate. It is better to start with a reasonable figure than to lowball yourself and regret it later.

Estimate costs with real research

For every line, check current prices. Get quotes for fabrication or specialist services if the project depends on them. Look up shipping rates, material suppliers, and equipment hire. If you are travelling internationally, check visa costs and health insurance.

Do not list aspirational costs or round every figure to a suspiciously neat number. A materials budget of exactly five hundred usually looks less convincing than four hundred and sixty-three. Small variations signal that you have done the homework.

If you are reusing materials you already own, you can either exclude them from the budget or list them as an in-kind contribution, depending on what the call asks for.

Add contingency only when it makes sense

A contingency is a small percentage added to the total to cover unexpected costs: price rises, damaged materials, extra shipping. It is common in large commissions, public art projects, or productions with many moving parts.

For a straightforward residency or small exhibition, contingency is often unnecessary. If the call has a tight maximum budget, leave it out and allocate funds carefully across the other lines. If the project is complex or involves unknowns—working with a new fabricator, shipping internationally, or depending on materials whose price fluctuates—a contingency of five to ten per cent is reasonable.

Always label it clearly as contingency. Do not inflate individual line items and call that your buffer; panels notice.

Match the format the call asks for

Some calls want a simple list with totals. Others provide a template with columns for item, quantity, unit cost, and total. A few ask you to split the budget into what you request from them and what you or other partners contribute.

If the brief asks for a narrative budget—a written explanation rather than a table—describe each category in a short paragraph, as you would in a project proposal. If you are applying for partial funding, make it obvious which costs you are asking them to cover.

Check that the numbers tell the same story as the proposal

Your budget and your project description must match. If you say you will make five sculptures but the materials line covers only two, the panel will notice. If you describe an ambitious installation but request no fabrication budget, they will assume you have not planned it properly.

Read both documents together before you send them. If something has changed since you drafted the proposal, update both.

Keep a copy with notes

After you submit, save your budget with notes on where each figure came from: quotes, supplier links, comparisons. If you are shortlisted and invited to interview, you may be asked to justify a line or adjust the total. If the project is awarded, you will need those numbers again for reporting or contracting.

Shortlisted matches your work to open calls that fit your practice, checks your eligibility, and drafts application documents including project budgets that you refine and submit.

Shortlisted

Let the calls come to your work.

Add your works once. Shortlisted checks every open call against each piece, rules out the ones you cannot enter and drafts the whole application for the one you pick.

More guides